Re: 1958 SWB C4 Fleetline - NZ Build
A LOT of work done - kudos. But won't that rubberized coating just burn away when they weld in the new roof? Or do they plan on using #M Panel dhesive? If welding I'd say a weld-through primer would have been a good choice where the welds go.
__________________
'55 Big Window Shortbed,
Drive-It-&-Work-On-It slid down the "slippery slope" to a Frame-Off Rodstoration! LQ4/4l85e/C4 IFS/Mustang 8.8 rearend w/3.73's
Dan's '55 Big Window "Build" - Well, Kinda!
|