After leaving Craig to deal with the temporary roofing felt job once rain subsided, he managed to get it done inbetween day job nd rain.
And as a temporary fix, I think it looks great.
It also allowed him to move toys and stuff about, including the space where the workshop/stables panels were since November.
A load of motorbikes nd scooters suddenly found themselves indoors in the dry as well.
Imam pleased for his toys sake, as open storage is not ideal.
My S10 had lived indoors all its previous 20 years and 38k miles and since coming here is outdoors, so I am eager to get the Rezin Rockit done to vacate space for both to be under cover.
Or sell the S10 if the right buyer comes along.