My upper links didnt get back from the machine shop on Friday so I didnt get as much done this weekend as I hoped.
I got the axle squared and located and tacked in the link mounts and finally got to bolt in those gorgeous lower links.
I spent some of the weekend working on the swaybar design. It is comprised of off the shelf circle track components.
I will make a custom adapter nut that utilized the lower link bolt as a mounting point for the swaybar linkage.