View Single Post
Old 12-11-2020, 02:33 PM   #125
geunther
Registered User
 
geunther's Avatar
 
Join Date: Apr 2005
Location: Cheyenne, WY
Posts: 742
Re: The build date project

Quote:
Originally Posted by 71CHEVYSHORTBED402 View Post
In my edgeucated opinion (90/10+) Z146839 is March 1972, though if you add it asterisk at your discretion.
Fun with math no doubt.
I looked at two of the closest dates available with a decent spread: (3-24) Z154193 and (4-28) Z163961. That is either 34 or 36 days (34 if you consider Z154193 was built at the end of the day and Z163961 was built at the beginning of the day). Using those numbers, the average is 287 trucks a day. 287 x 24 (March 1 to Mach 24) = 6888 trucks. Backing up from 3-24, the earliest for March would be Z147305.

Certainly Z146839 was built in either February or March. I'll add an asterisk, ? for the month and a note. Ill bet we can make better estimates soon.

Last edited by geunther; 12-11-2020 at 02:41 PM.
geunther is offline   Reply With Quote