View Single Post
Old 01-14-2015, 04:24 PM   #105
MattPSU
Registered User
 
MattPSU's Avatar
 
Join Date: Nov 2011
Location: Lyman, SC
Posts: 734
Re: Crocodile Rocks Build Thread

In between work and being at Mark's body shop, I cleaned up and painted the engine & transmission.

I also started on the wire harness. I used the instructions on LT1Swap.com to thin out and extend my harness. This was time consuming and tedious at times, but in the long run I was really happy with it. I think I have 25-30 hours in it at least. I planed to relocate the PCM, supplementary fuse panel and relays under the dash. I picked up a 3" firewall grommet to run everything through.
Attached Images
     
__________________
Matt Criswell - Lyman, SC

1972 Chevy Cheyenne SWB - Build: Porterbuilt State 1 Front & Rear, Bolt in Notch, McGaughys 2.5 Drop Spindles, Boyd Welding Fuel Tank

UPSTATE SC GM TRUCK CLUB: FACEBOOK WEBSITE
MattPSU is offline   Reply With Quote