View Single Post
Old 11-09-2010, 03:08 AM   #75
tantrumpipeline
Master Procrastinator
 
tantrumpipeline's Avatar
 
Join Date: Sep 2009
Location: Grande Prairie AB Canada
Posts: 1,128
Re: Finally starting the 68swb fleet

upper and lower control arms got 2 shots of rust sealing primer, sandblasted prior, but why not go the extra mile, 1st shot of silver now it's bed time, tomorrow the trailing arm rebuild and the final silver coats then if all works out wed the cross shafts come in and the drop can be installed, heads and wheel/tire combo are about 2 weeks from delivery, so the motor and tranny are next in line for teardown
__________________
My Buildhttp://67-72chevytrucks.com/vboard/s...d.php?t=395506
20 Duramax tow pig
68 2wd short stepper project
77 2wd short fleet beater
52 short project
tantrumpipeline is offline   Reply With Quote