Re: 48 Burb, bagged, 5.3, 20 year wait
Boxed in the third cross channel piece, actually correctly located the hole in the top plate for the pipe, drilled the holes 3" apart and welded in the top plate.
Here is where we ended on Sunday night. Ran out of steam about 5:30 and called it good. Doesn't look like a lot of progress and it really is the result of about 20 hours hard labor.
Next up will be lifting the body from the frame to install the rear most cross channel piece as it won't clear any other way. Have to build those body mounts too.
Then on to the fabrication over the bag mounts, rear end and wheel tubs. Have it pictured in the "mind" cad cam and believe it will work out.
|