Re: 48 Burb, bagged, 5.3, 20 year wait
Set the assembly in place to mark where the supports need to be plug welded to the floor. Naturally they landed right on top of the floor plug welds that hadn't been ground smooth yet. Took care of that and still have some tweaking around perimeter before welding the riser pan back in.
|