View Single Post
Old 01-31-2016, 08:36 PM   #958
Advanced Design
Senior Member
 
Advanced Design's Avatar
 
Join Date: Jul 2012
Location: Oblong, Illinois
Posts: 7,017
Re: 48 Burb, bagged, 5.3, 20 year wait

Set the assembly in place to mark where the supports need to be plug welded to the floor. Naturally they landed right on top of the floor plug welds that hadn't been ground smooth yet. Took care of that and still have some tweaking around perimeter before welding the riser pan back in.
Attached Images
 
Advanced Design is offline   Reply With Quote