I think I made good progress this weekend. I got the last brake line made up and installed, got the M/C painted, bench bled, and mounted to the firewall and brake pedal. System is now ready to bleed.
Also got the heater box mounted to the firewall, the plug for the rear light harness install, and the gas pedal linkage at the firewall install.
Must have installed the gas pedal linkage after I took that picture...sorry about that...
Added a little reflective insulation to the inside of the firewall. Just need to finish up the wiring for the heater and the hoses to the dash vents.
Finished the day by putting the seat back in the cab. Looks like I need to lower it a bit, but will live with it for now. I can still squeeze my fat a$$ between the seat and steering wheel.
__________________