View Single Post
Old 04-02-2018, 04:13 PM   #24
Advanced Design
Senior Member
 
Advanced Design's Avatar
 
Join Date: Jul 2012
Location: Oblong, Illinois
Posts: 7,017
Re: Shop improvements and upgrades. Better Space!

The repair was to support the roof truss, cut out about 18” of pipe at the bottom, butt weld in new pipe with a plate on the bottom, bolt that new plate into the concrete piling, then weld a sleeve over the new joint.
Attached Images
 
Advanced Design is offline   Reply With Quote