The 1947 - Present Chevrolet & GMC Truck Message Board Network







Register or Log In To remove these advertisements.

Go Back   The 1947 - Present Chevrolet & GMC Truck Message Board Network > 47 - Current classic GM Trucks > The 1967 - 1972 Chevrolet & GMC Pickups Message Board > 67-72 Chevrolet & GMC Pickups Projects and Builds

Web 67-72chevytrucks.com


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 01-30-2019, 11:59 PM   #11
TA_C10
Registered User
 
TA_C10's Avatar
 
Join Date: Jun 2018
Location: Texas
Posts: 1,353
Re: 1971 Stepside LS Build

Quote:
Originally Posted by 1971Stepside View Post
Just some more slow progress. Original plan was to run the braided line the full distance, but then I started reading about vapor smell from the lines and decided to put a hard line in. Just mocking up here, but satisfied with the header clearance and the overall fit. Simply bought a 58" inch piece of 3/8" tubing. Virtually a straight run down the frame.
Can you give me details on this setup? I am doing the same thing on a 5.3 with a corvette filter/regulator. What fittings for both AN and aluminum did you use and how much braided did you use? I need to know what to purchase for my fuel lines. I already have the 3/8" aluminum line, but don't have any AN line or fittings yet and want to order the right parts...

Everything is looking good on you truck!

Tom
__________________
TA_C10 Stage 1 build - http://67-72chevytrucks.com/vboard/s....php?p=8333444

"It's only money".
TA_C10 is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 06:45 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright 1997-2022 67-72chevytrucks.com